A1 |
Pipeline 48 inch 75 Km |
Mastery Of Electricity |
Construction of 48 inch, 75 Km
Pipeline |
Baghdad |
2010 |
A2 |
Pipeline 32 inch 45 km |
Mastery Of Electricity |
Construction of 32 inch, 45 km
Pipeline |
Baghdad |
2012 |
A3 |
Pipeline 100 km |
CPECC-SOC |
Construction of 18 inch, 100 km Pipeline |
Basra |
2015-2018 |
A4 |
Trunkline & Flowline |
CPECC company |
Construction Of Trunkline And Flowline |
Masan - Halfaya |
2011 |
A5 |
Flowlines no. 15 |
CPECC company |
Construction Of Flowline |
Al-Ahdep Oil Filed |
2011 |
A6 |
Trank line no. 10 |
CPECC company |
Construction Of Trunkline |
Al-Ahdep Oil Filed |
2012 |
A7 |
Water line 20 inch fiber glass 15 km |
CPECC company |
20 inch fiber glass, Water line 15
km |
Al-Ahdep Oil Filed |
2014 |
A8 |
Diyala river crossing pipe |
Mastery of electricity |
Construction 84m trough river |
Baghdad |
2010 |
A9 |
Pipeline -130km- kurbla |
Hyundai -Scop |
fibrication,construction,electric
work,buildding construction |
Kurbla |
2015 |
A10 |
CPF3 Interconnection Trunklines |
CPECC |
fibrication,construction,electric
work,buildding construction |
Masan - Halfaya |
2017 |
A11 |
Engineering ,Procurment & Construction
for Production Well Pad 11/1A and
Associated Gathering System Expansion |
Lukoil |
Engineering ,Procurment &
Construction for Production Well
Pad 11/1A and Associated
Gathering System Expansion |
Basra -WQ2 |
2017 |
A12 |
PROVISION OF Engineering
PROCUREMENT, CONSTRUCTION AND
COMMISSIONING FOR FIELD SURFACE
FACILITIES (FSF) AROUND CPF3 Tender
Number :HFY-CON/F&C0872-0896
|
Petrochina |
PROVISION OF Engineering
PROCUREMENT, CONSTRUCTION
AND COMMISSIONING FOR FIELD
SURFACE FACILITIES (FSF)
AROUND CPF3 Tender Number :HFY |
Masan - Halfaya |
2018 |
A13 |
Wellpad HFY-CON/F&C0874-
0898 PROVISION OF Engineering
PROCUREMENT, CONSTRUCTION AND
COMMISSIONING(PCC) OF WELLPADS
FACILITIES(2018-2021)
|
Petrochina |
Wellpad HFY-CON/F&C0874-
0898 PROVISION OF Engineering
PROCUREMENT, CONSTRUCTION
AND COMMISSIONING(PCC) OF
WELLPADS FACILITIES(2018-2021) |
Masan - Halfaya |
2017 |
A14 |
HFY-CON/F&C0869-0893///PROVISION
OF Enginnering , Procurments And
CONSTRUCTION OF FLOW LINES AND
TRUNK LINES (2018-2021) |
Petrochina |
HFY-CON/F&C0869-
0893///PROVISION OF Enginnering
, Procurments And CONSTRUCTION
OF FLOW LINES AND TRUNK LINES
(2018-2021) |
Masan - Halfaya |
2017 |
A15 |
BGC 405 HAMMER MISHRIF PIPELINE
PROJECT |
CPECC/ BGC |
Construction Work For BGC 405
HAMMER MISHRIF PIPELINE
Project |
BASRAHAMMAR/MUSHRIF |
2018 |
B: Crossing Works ( HDD and Thrus Boring ) |
B1 |
HDD-18 inch SOC Gas Pipeline Basra River
Crossing |
SOC |
HDD Crossing |
Basra |
2016 |
B2 |
HDD- 6 inch SOC - Basra River Crossing |
SOC |
HDD Crossing |
Basra |
2016 |
B3 |
Diyala river crossing pipe |
Mastery of electricity |
Construction 84m trough river |
Baghdad |
2010 |
C: Piping |
C1 |
Piping Fabrication and Installation |
ExxonMobil |
fibrication,construction |
Basra WQ1 |
2013-2018 |
C2 |
Piping And Steel St. Works |
Samsung |
Gas compressor station |
Badra Oil Filed |
2014 |
C3 |
Piping Works For Zubair North New DGS
Project-SU2745 |
Samsung |
fibrication,construction |
Zubair Oil Filed |
2015-2018 |
C4 |
Piping Works |
STX |
Fire fighting piping works and
tanks cooling ring |
Zubair Oil Filed |
2015 |
C5 |
CPF3 Interconnection Trunklines |
CPECC |
fibrication,construction,electric
work,buildding construction |
Masan - Halfaya |
2017 |
C6 |
Engineering ,Procurment & Construction
for Production Well Pad 11/1A and
Associated Gathering System Expansion |
Lukoil
|
Engineering ,Procurment &
Construction for Production Well
Pad 11/1A and Associated |
Basra -WQ2 |
2017 |
C7 |
PROVISION OF Engineering
PROCUREMENT, CONSTRUCTION AND
COMMISSIONING FOR FIELD SURFACE
FACILITIES (FSF) AROUND CPF3 Tender
Number :HFY-CON/F&C0872-0896 |
Petrochina |
PROVISION OF Engineering
PROCUREMENT, CONSTRUCTION
AND COMMISSIONING FOR FIELD
SURFACE FACILITIES (FSF)
AROUND CPF3 Tender Number :HFY |
Masan - Halfaya |
2018 |
C8 |
Wellpad HFY-CON/F&C0874-
0898 PROVISION OF Engineering
PROCUREMENT, CONSTRUCTION AND
COMMISSIONING(PCC) OF WELLPADS
FACILITIES(2018-2021)
|
Petrochina |
Wellpad HFY-CON/F&C0874-
0898 PROVISION OF Engineering
PROCUREMENT, CONSTRUCTION
AND COMMISSIONING(PCC) OF
WELLPADS FACILITIES(2018-2021) |
Masan - Halfaya |
2017 |
C9 |
HFY-CON/F&C0869-0893///PROVISION
OF Enginnering , Procurments And
CONSTRUCTION OF FLOW LINES AND
TRUNK LINES (2018-2021)
|
Petrochina |
HFY-CON/F&C0869-
0893///PROVISION OF Enginnering
, Procurments And CONSTRUCTION
OF FLOW LINES AND TRUNK LINES
(2018-2021) |
Masan - Halfaya |
2017 |
C10 |
BGC 405 HAMMER MISHRIF PIPELINE
PROJECT |
CPECC/ BGC |
Construction Work For BGC 405
HAMMER MISHRIF PIPELINE
Project |
BASRAHAMMAR/MUSHRIF |
2018 |
D: Tanks
|
D1 |
9 oil tank in badra filed |
Petrofac |
fibrication,construction |
Badra Oil Filed |
2013 |
D2 |
6 tank construction For Zubair North New
DGS Project-SU2745 |
Samsung |
construction |
Ziber Oil Filed |
2016-2017 |
D3 |
Tanks |
CPECC-BP |
fibrication at workshop,construction
at site |
Basra south Rumaila |
2011 |
D4 |
Tanks degassing station 5 |
CPECC-BP |
fibrication,construction |
Basra north Rumaila |
2013 |
D5 |
Tanks Erection |
Petrofac |
Tanks erection |
Badra Oil Filed |
2013 |
D6 |
Tanks erection |
Samsung |
Tanks erection |
Badra Oil Filed |
2014 |
D7 |
Tank for Ahdeb oil filed |
CPECC company |
Tanks Erection |
Al-Ahdep Oil Filed |
2014 |
E: Civil |
E1 |
civil works |
CPECC |
construction |
north rumala oil filed |
2015-2016 |
E2 |
civil work -construction camp |
Hyundai-Scop |
fibrication,construction,electric
work,buildding construction |
Kurbla |
2015 |
E3 |
Civil work foundation for tank 56 thousand
and cubic meter |
CPECC company |
construction |
Al-Ahdep Oil Filed |
2011 |
E4 |
Civil Works & foundation for tank |
CPP |
construction |
Nasiriya Oil Depot |
2017 |
E5 |
CPF3 Interconnection Trunklines |
CPECC |
fibrication,construction,electric
work,buildding construction |
Masan - Halfaya |
2017 |
E6 |
Engineering ,Procurment & Construction
for Production Well Pad 11/1A and
Associated Gathering System Expansion |
Lukoil
|
Engineering ,Procurment &
Construction for Production Well
Pad 11/1A and Associated
Gathering System Expansion |
Basra -WQ2 |
2017 |
E7 |
TEMPORARY CAMP & FACILITIES OF EPCC
PROJECT OF OIL GATHERING FACILITIES
PHASE 3 FOR PETRONAS CARIGALI IRAQ
HOLDING B.V'S GARRAF |
HBP |
construction |
Garraf Oil Field |
2017 |
E8 |
PROVISION OF Engineering
PROCUREMENT, CONSTRUCTION AND
COMMISSIONING FOR FIELD SURFACE
FACILITIES (FSF) AROUND CPF3 Tender
Number :HFY-CON/F&C0872-0896 |
Petrochina |
PROVISION OF Engineering
PROCUREMENT, CONSTRUCTION
AND COMMISSIONING FOR FIELD
SURFACE FACILITIES (FSF)
AROUND CPF3 Tender Number :HFY |
Masan - Halfaya |
2018 |
E9 |
Wellpad HFY-CON/F&C0874-
0898 PROVISION OF Engineering
PROCUREMENT, CONSTRUCTION AND
COMMISSIONING(PCC) OF WELLPADS
FACILITIES(2018-2021)
|
Petrochina |
Wellpad HFY-CON/F&C0874-
0898 PROVISION OF Engineering
PROCUREMENT, CONSTRUCTION
AND COMMISSIONING(PCC) OF
WELLPADS FACILITIES(2018-2021) |
Masan - Halfaya |
2017 |
E10 |
HFY-CON/F&C0869-0893///PROVISION
OF Enginnering , Procurments And
CONSTRUCTION OF FLOW LINES AND
TRUNK LINES (2018-2021) |
Petrochina |
HFY-CON/F&C0869-
0893///PROVISION OF Enginnering
, Procurments And CONSTRUCTION
OF FLOW LINES AND TRUNK LINES
(2018-2021) |
Masan - Halfaya |
2017 |
E11 |
BGC 405 HAMMER MISHRIF PIPELINE
PROJECT |
CPECC/ BGC |
Construction Work For BGC 405
HAMMER MISHRIF PIPELINE
Project |
BASRAHAMMAR/MUSHRIF |
2018 |
F: Mechanic &Steel Structure
|
F1 |
Steel Structure |
Samsung |
Steel Structure & mechanic
Equipment Installationof |
Badra Oil Filed |
2014 |
F2 |
CPF2 |
CPECC company |
fibrication & Installation |
Masan halfaya |
2012 |
F3 |
CPF second step |
CPECC company |
Fibrication & Installation |
Al-Ahdep Oil Filed |
2013 |
F4 |
Water injection second step |
CPECC company |
Fibrication & Installation |
Al-Ahdep Oil Filed |
2014 |
F5 |
Gas station ahdeb field |
CPECC company |
Steel Structure & mechanic
Equipment Installationof |
Al-Ahdep Oil Filed |
2013 |
F6 |
CPF second step |
CPECC company |
Steel Structure & mechanic
Equipment Installationof |
Al-Ahdep Oil Filed |
2012 |
F7 |
steel Structure - Kurbala nifery |
Hyundai-Scop |
Steel Structure & mechanic
Equipment Installationof |
Kurbala |
2015 |
F8 |
steel Structure For Zubair North New DGS
Project-SU2745 |
Samsung |
Steel Structure & mechanic
Equipment Installationof |
Ziber Oil Filed |
2015-2017 |
F9 |
water treatment |
CPP |
Installation |
Gharf oil filed |
2016-2018 |
G: Electrical And Instrumentation |
G1 |
Construction of Electric & instrument |
Samsung |
construction of Electric &
instrument |
Badra Oil Filed |
2014 |
G2 |
CPF2 |
CPECC company |
construction of Electric &
instrument |
Masan halfaya |
2012 |
G3 |
CPF second step |
CPECC company |
construction of Electric &
instrument |
Al-Ahdep Oil Filed |
2013 |
G4 |
Water injection second step |
CPECC company |
construction of Electric &
instrument |
Al-Ahdep Oil Filed |
2014 |
G5 |
Zubair Oil Field (5 Degassing Station )
Construction of Clean Agent System |
STX |
construction of Electric &
instrument |
Zubair Oil Field |
2014 |
G6 |
Installation of LV Swetch gears |
STX |
Swetch gears Installation |
Zubair Oil Field |
2015 |
G7 |
Engineering ,Procurment & Construction
for Production Well Pad 11/1A and
Associated Gathering System Expansion |
Lukoil |
Engineering ,Procurment &
Construction for Production Well
Pad 11/1A and Associated
Gathering System Expansion |
Basra -WQ2 |
2017 |
G8 |
PROVISION OF Engineering
PROCUREMENT, CONSTRUCTION AND
COMMISSIONING FOR FIELD SURFACE
FACILITIES (FSF) AROUND CPF3 Tender
Number :HFY-CON/F&C0872-0896 |
Petrochina |
PROVISION OF Engineering
PROCUREMENT, CONSTRUCTION
AND COMMISSIONING FOR FIELD
SURFACE FACILITIES (FSF)
AROUND CPF3 Tender Number :HFYCON/F&C0872-0896 |
Masan - Halfaya |
2018 |
G9 |
Wellpad HFY-CON/F&C0874-
0898 PROVISION OF Engineering
PROCUREMENT, CONSTRUCTION AND
COMMISSIONING(PCC) OF WELLPADS
FACILITIES(2018-2021) |
Petrochina |
Wellpad HFY-CON/F&C0874-
0898 PROVISION OF Engineering
PROCUREMENT, CONSTRUCTION
AND COMMISSIONING(PCC) OF
WELLPADS FACILITIES(2018-2021) |
Masan - Halfaya |
2017 |
G10 |
HFY-CON/F&C0869-0893///PROVISION
OF Enginnering , Procurments And
CONSTRUCTION OF FLOW LINES AND
TRUNK LINES (2018-2021)
|
Petrochina |
HFY-CON/F&C0869-
0893///PROVISION OF Enginnering
, Procurments And CONSTRUCTION
OF FLOW LINES AND TRUNK LINES
(2018-2021) |
Masan - Halfaya |
2017 |
G11 |
BGC 405 HAMMER MISHRIF PIPELINE
PROJECT |
CPECC/ BGC |
Construction Work For BGC 405
HAMMER MISHRIF PIPELINE
Project |
BASRAHAMMAR/MUSHRIF |
2018 |
H: Mantinance And Ganeral Services |
H1 |
Mantinance And Ganeral Services |
ExxonMobil |
Mantinance And Ganeral Services |
Basra WQ1 |
2013-2018 |
H2 |
Provision of personnel transportation,
specialized vehicles & road and pad
maintenance and repair services on Badra
oilfield |
Gazprom |
Mantinance And Ganeral Services |
Badra oilfield |
2013-2015 |
H3 |
EPCC of Waste Management Facilities and
Industrial Solid Waste Incinerator for
PCIHBV |
Petronas |
EPCC |
Garraf Oil Field |
2017 |